Friday, 21 , November of 2008

Case Histories

  • Erosion Control
  • Drainage
  • Soft Soil Stabilization
  • Retailing Walls
  • Coastal Protecion
 

Retaining wall made of concrete tablet finishing

Project:

Retaining wall using ACE GG geogrid made of concrete tablets finishing

Place:

Tlapa, Guerrero.

Problem:

In the State of Guerrero, Mexico the people who live there required the construction of an electrical sub-station to be able to take care of the energy necessities. By such reason in that complex the construction of diverse platforms and retaining walls were projected to have the bearing capacity to be able to support to the necessary equipment for the good operation of the sub-station.

Solution:

The platforms and the retaining walls were constructed with local soil and it was compacted in layers between which a system of soil reinforcement was integrated. It was ACE GG100-I and ACE GG 60-I geogrid. A “ML Ingeniería” 7 cm prefabricated concrete tablet was integrated to the system that offers aesthetic finishing to the work. These tablets do not work structurally because geogrid do the work to support the operating earth pushes.

Return to Representative Works >>>

 


Copyright © 2008 ML Ingeniería
Developed by Ezra

Mexico City Office

Av. Insurgentes Sur No.1991, Torre A Desp.100-A,
Col. Guadalupe Inn, Álvaro Obregón,
México, DF, C.P. 01020
Tel +52 (55) 5662-6110
Fax +52(55) 5662-0086

Call for free from
Mexico : 
01 800 58 11 646
ml@mlingenieria.com

Monterrey Office

Blvd. Díaz Ordaz No. 140, Torre II, Piso 20
Col. Santa María,
Monterrey, N.L. CP. 64650
Tel +52 (81) 8865-4846
Fax +52(81) 8865-4598